Twenty eight years after the first Turnstone Cove was designed and built, there was another major remodel adding on to the existing house and tying it into the Garage.
Both the Greatroom and the Master Bedroom were expanded four feet, a new Master Bath was built, the Kitchen was expanded, a new circular stair was added, and the Loft areas were expanded and remodeled.
Hands-on construction experience was acquired doing all facets of home construction except for the foundation and the plumbing with were subbed out.
Some of these skills were decking, demolition, drywall, electrical, finish carpentry, flooring, insulation, masonry, painting & staining, foofing, siding, site work & landscaping, tile, and windows and doors.
Since the boys had moved on to college, they came home to help with some of the heavy work along with Luke Walters, then Lynn and I did most of the rest of the work alone.
unless noted otherwise all images copyright d. holmes chamberlin jr architect llc

Son, Ryan, helps with the demolition of roof and fireplace for new addition, Turnstone Cove III, Yachats, Oregon, USA, 1999.

Sawing concrete for a new Garage door, Turnstone Cove III, Yachats, Oregon, USA, 2019.
Son, Wyatt, helps with the first framing for the new picture window wall over-looking the Pacific, Turnstone Cove III, Yachats, Oregon, USA, 1999.

New framing of circular entrace porch, Turnstone Cove III, Yachats, Oregon, USA, 1999.

New framing and plywood shear walls for the Entrance Hall and Lofts, Turnstone Cove III, Yachats, Oregon, USA, 1999.

Installing batt insulation to the new ceiling/roof, Turnstone Cove III, Yachats, Oregon, USA, 1999.

Installing drywall in the new Hall, Stair, and Loft areas, Turnstone Cove III, Yachats, Oregon, USA, 1999.

Applying rough knock-down texture to drywall, Turnstone Cove III, Yachats, Oregon, USA, 1999.

Construction a new cedar deck, Turnstone Cove III, Yachats, Oregon, USA, 1999.

Installing and grouting tile in the Entry and Hall, Turnstone Cove III, Yachats, Oregon, USA, 2000.
Installing tile on the fireplace in the Greatroom along with the finished grouting, Turnstone Cove III, Yachats, Oregon, USA, 2000.

Installing the split-face concrete block fire pit, Turnstone Cove III, Yachats, Oregon, USA, 2004.

Working on cabinet trims for the Kitchen island along with finished oak cabinets constructed for the Greatroom, Turnstone Cove III, Yachats, Oregon, USA, 2004.

Cultured stone masonry installation, Turnstone Cove III, Yachats, Oregon, USA, 2005.

Installing pre-finished floating oak flooring, Turnstone Cove III, Yachats, Oregon, USA, 2005.

Arrival of circular oak stair from the east coast and Construction of landing and installation ostair, Turnstone Cove III, Yachats, Oregon, USA, 2006.

Creating river rock foundation trim beds to control rain/mud splash, Turnstone Cove III, Yachats, Oregon, USA, 2010.

Installing tile in the Laundry, Turnstone Cove III, Yachats, Oregon, USA, 2010.

Creating "fence posts" out of 6x6 pressure-treated lumber to mark property lines, Turnstone Cove III, Yachats, Oregon, USA, 2016.

The whole family helped rip out the old cedar deck and I installed a new Trex deck with the help of Laura Walters, Turnstone Cove III, Yachats, Oregon, USA, 2018.